Major and Sup GroupsAvg. 2024Avg. 2025% Change
Water Reservoirs121.47116.59-4.02
Excavations131.23129.41-1.39
Concrete106.20105.49-0.66
Iron134.46120.61-10.30
Construction work and paint143.49144.270.55
Miscellaneous115.82116.080.22
Administrative expenses127.62126.04-1.24
Water Networks135.09136.651.15
Excavations131.23129.41-1.39
Deface Materials106.57108.181.51
Asphalt bitumen mixture and its products98.7899.440.66
Plastic and steel pipes 147.75151.572.59
Administrative expenses127.62126.04-1.24
Wages and other costs164.77162.80-1.19
General index130.84130.38-0.35