Water Networks Cost Indices by Major and Sub Groups in the West Bank for the Years 2022 and 2021
(Base Month January 2010=100)
Publish Date:25-01-2023
 Click Here To Download Data as CSV File
| Major and Sup Groups | Avg. 2021 | Avg. 2022 | % Change | 
| Water Reservoirs | 115.43 | 123.00 | 6.56 | 
| Excavations | 123.95 | 129.80 | 4.72 | 
| Concrete | 100.69 | 103.89 | 3.17 | 
| Iron | 129.30 | 145.03 | 12.16 | 
| Construction work and paint | 131.29 | 136.09 | 3.66 | 
| Miscellaneous | 110.62 | 113.39 | 2.50 | 
| Administrative expenses | 122.69 | 126.92 | 3.45 | 
| Water Networks | 124.63 | 131.49 | 5.50 | 
| Excavations | 123.95 | 129.80 | 4.72 | 
| Deface Materials | 99.06 | 101.52 | 2.48 | 
| Asphalt bitumen mixture and its products | 84.09 | 89.12 | 5.98 | 
| Plastic and steel pipes | 138.49 | 147.83 | 6.75 | 
| Administrative expenses | 122.69 | 126.92 | 3.45 | 
| Wages and other costs | 146.22 | 152.93 | 4.59 | 
| General index | 121.76 | 128.84 | 5.82 | 