Water Networks Cost Indices and Percent Changes by Major and Sub Group in the West Bank*: November and December 2019
(Base Month January 2010= 100)
click Here To Download Excel File |
|||
Major and Sup Groups |
November 2019 |
December 2019 |
% Change |
Water Reservoirs |
103.82 |
103.70 |
-0.12 |
Excavations |
124.33 |
123.86 |
-0.38 |
Concrete |
103.14 |
102.99 |
-0.14 |
Iron |
91.85 |
91.12 |
-0.79 |
Construction work and paint |
125.22 |
128.96 |
2.99 |
Miscellaneous |
106.66 |
106.24 |
-0.39 |
Administrative expenses |
120.44 |
118.70 |
-1.44 |
Water Networks |
117.29 |
119.52 |
1.91 |
Excavations |
124.33 |
123.86 |
-0.38 |
Deface Materials |
102.63 |
102.61 |
-0.02 |
Asphalt, bitumen mixture and its products |
88.07 |
87.76 |
-0.35 |
Plastic and steel pipes |
123.10 |
127.66 |
3.70 |
Administrative expenses |
120.44 |
118.70 |
-1.44 |
Wages and other costs |
136.09 |
138.80 |
1.99 |
General index |
113.08 |
114.58 |
1.33 |
*Data exclude those parts of Jerusalem which were annexed by Israeli Occupation in 1967. |