Water Networks Cost Indices and Percent Changes by Major and Sub Group in the West Bank*: November and December 2019

(Base Month January 2010= 100)

 

click Here To Download Excel File

 Major and Sup Groups

November 2019

December 2019

% Change

Water Reservoirs

103.82

103.70

-0.12

Excavations

124.33

123.86

-0.38

Concrete

103.14

102.99

-0.14

Iron

91.85

91.12

-0.79

Construction work and paint

125.22

128.96

2.99

Miscellaneous

106.66

106.24

-0.39

Administrative expenses

120.44

118.70

-1.44

Water Networks

117.29

119.52

1.91

Excavations

124.33

123.86

-0.38

Deface Materials

102.63

102.61

-0.02

Asphalt, bitumen mixture and its products

88.07

87.76

-0.35

Plastic and steel pipes 

123.10

127.66

3.70

Administrative expenses

120.44

118.70

-1.44

Wages and other costs

136.09

138.80

1.99

General  index

113.08

114.58

1.33


*Data exclude those parts of Jerusalem which were annexed by Israeli Occupation in 1967.