Water Networks Cost Indices and Percent Changes by Major and Sub Group in the West Bank*: April and May 2018
(Base Month January 2010= 100)
Click Here To Download |
|||
Major and Sup Groups |
April 2018 |
May 2018 |
% Change |
Water Reservoirs |
110.32 |
110.26 |
-0.06 |
Excavations |
126.02 |
125.94 |
-0.07 |
Concrete |
104.65 |
104.68 |
0.03 |
Iron |
110.83 |
110.62 |
-0.19 |
Construction work and paint |
121.42 |
121.42 |
0.00 |
Miscellaneous |
107.34 |
107.34 |
0.00 |
Administrative expenses |
118.10 |
118.10 |
0.00 |
Water Networks |
115.51 |
115.46 |
-0.04 |
Excavations |
126.02 |
125.94 |
-0.07 |
Deface Materials |
102.52 |
102.37 |
-0.14 |
Asphalt, bitumen mixture and its products |
85.05 |
85.30 |
0.29 |
Plastic and steel pipes |
120.88 |
120.76 |
-0.10 |
Administrative expenses |
118.10 |
118.10 |
0.00 |
Wages and other costs |
133.05 |
133.05 |
0.00 |
General index |
113.89 |
113.84 |
-0.05 |
*Data exclude those parts of Jerusalem which were annexed by Israeli Occupation in 1967. |