Water Networks Cost Indices and Percent Changes by Major and Sub Group in the West Bank*: April and May 2018

(Base Month January 2010= 100)

 

<![if supportMisalignedColumns]> <![endif]>

Click Here To Download

 Major and Sup Groups

April 2018 

May 2018 

% Change

Water Reservoirs

110.32

110.26

-0.06

Excavations

126.02

125.94

-0.07

Concrete

104.65

104.68

0.03

Iron

110.83

110.62

-0.19

Construction work and paint

121.42

121.42

0.00

Miscellaneous

107.34

107.34

0.00

Administrative expenses

118.10

118.10

0.00

Water Networks

115.51

115.46

-0.04

Excavations

126.02

125.94

-0.07

Deface Materials

102.52

102.37

-0.14

Asphalt, bitumen mixture and  its products

85.05

85.30

0.29

Plastic and steel pipes 

120.88

120.76

-0.10

Administrative expenses

118.10

118.10

0.00

Wages and other costs

133.05

133.05

0.00

General  index

113.89

113.84

-0.05


*Data exclude those parts of Jerusalem which were annexed by Israeli Occupation in 1967.