Water Networks Cost Indices and Percent Changes by Major and Sub Group in the West Bank: November and December 2017

(Base Month January 2010= 100)

 

Click Here To Download Excel File

 Major and Sup Groups

November 2017 

December 2017 

% Change

Water Reservoirs

107.36

108.66

1.21

Excavations

125.95

126.08

0.11

Concrete

104.44

104.44

0.00

Iron

102.44

106.33

3.79

Construction work and paint

120.10

120.32

0.18

Miscellaneous

107.15

107.17

0.01

Administrative expenses

116.38

116.98

0.52

Water Networks

115.25

115.54

0.25

Excavations

125.95

126.08

0.11

Deface Materials

101.55

101.29

-0.25

Asphalt, bitumen mixture and  its products

85.09

85.18

0.11

Plastic and steel pipes 

122.07

121.88

-0.15

Administrative expenses

116.38

116.98

0.52

Wages and other costs

128.56

131.36

2.18

General  index

112.78

113.39

0.54