Water Networks Cost Indices and Percent Changes by Major and Sub Group in the West Bank: November and December 2017
(Base Month January 2010= 100)
Click Here To Download Excel File |
|||
Major and Sup Groups |
November 2017 |
December 2017 |
% Change |
Water Reservoirs |
107.36 |
108.66 |
1.21 |
Excavations |
125.95 |
126.08 |
0.11 |
Concrete |
104.44 |
104.44 |
0.00 |
Iron |
102.44 |
106.33 |
3.79 |
Construction work and paint |
120.10 |
120.32 |
0.18 |
Miscellaneous |
107.15 |
107.17 |
0.01 |
Administrative expenses |
116.38 |
116.98 |
0.52 |
Water Networks |
115.25 |
115.54 |
0.25 |
Excavations |
125.95 |
126.08 |
0.11 |
Deface Materials |
101.55 |
101.29 |
-0.25 |
Asphalt, bitumen mixture and its products |
85.09 |
85.18 |
0.11 |
Plastic and steel pipes |
122.07 |
121.88 |
-0.15 |
Administrative expenses |
116.38 |
116.98 |
0.52 |
Wages and other costs |
128.56 |
131.36 |
2.18 |
General index |
112.78 |
113.39 |
0.54 |
The data of the West Bank doesn't cover those parts of Jerusalem which were annexed by Israel in 1967. |