Water Networks Cost Indices and Percent Changes by Major and Sub Group in the West Bank: December 2017 and January 2018

(Base Month January 2010= 100)

 

<![if supportMisalignedColumns]> <![endif]>

Click Here To Download Excel File

 Major and Sup Groups

December 2017 

January 2018 

% Change

Water Reservoirs

108.66

108.74

0.08

Excavations

126.08

126.38

0.24

Concrete

104.44

104.01

-0.41

Iron

106.33

107.11

0.73

Construction work and paint

120.32

120.32

0.00

Miscellaneous

107.17

107.17

0.00

Administrative expenses

116.98

116.98

0.00

Water Networks

115.54

115.62

0.07

Excavations

126.08

126.38

0.24

Deface Materials

101.29

101.28

-0.02

Asphalt, bitumen mixture and its products

85.18

85.70

0.61

Plastic and steel pipes 

121.88

121.87

-0.01

Administrative expenses

116.98

116.98

0.00

Wages and other costs

131.36

131.36

0.00

General  index

113.39

113.47

0.08


The data of the West Bank doesn't cover those parts of Jerusalem which were annexed by Israel in 1967.