Water Networks Cost Indices and Percent Changes by Major and Sub Group in the West Bank: December 2017 and January 2018
(Base Month January 2010= 100)
Click Here To Download Excel File |
|||
Major and Sup Groups |
December 2017 |
January 2018 |
% Change |
Water Reservoirs |
108.66 |
108.74 |
0.08 |
Excavations |
126.08 |
126.38 |
0.24 |
Concrete |
104.44 |
104.01 |
-0.41 |
Iron |
106.33 |
107.11 |
0.73 |
Construction work and paint |
120.32 |
120.32 |
0.00 |
Miscellaneous |
107.17 |
107.17 |
0.00 |
Administrative expenses |
116.98 |
116.98 |
0.00 |
Water Networks |
115.54 |
115.62 |
0.07 |
Excavations |
126.08 |
126.38 |
0.24 |
Deface Materials |
101.29 |
101.28 |
-0.02 |
Asphalt, bitumen mixture and its products |
85.18 |
85.70 |
0.61 |
Plastic and steel pipes |
121.88 |
121.87 |
-0.01 |
Administrative expenses |
116.98 |
116.98 |
0.00 |
Wages and other costs |
131.36 |
131.36 |
0.00 |
General index |
113.39 |
113.47 |
0.08 |
The data of the West Bank doesn't cover those parts of Jerusalem which were annexed by Israel in 1967. |