Sewage Networks Cost Indices and Percent Changes by Major and Sub Groups in the West Bank*: November and December 2018

(Base Month January 2010=100)

 

click Here To Download Excel File

Major and Sup Groups

November 2018 

December 2018 

% Change

Excavations

123.79

124.19

0.32

Deface Materials

103.08

103.01

-0.07

Asphalt, bitumen mixture and its products

90.47

86.07

-4.86

Plastic and cements pipes

101.38

101.50

0.12

Fountains

108.65

108.40

-0.23

Administrative expenses

119.34

119.37

0.02

Wages and other costs

139.87

138.16

-1.23

General  index

109.75

109.33

-0.38


*Data exclude those parts of Jerusalem which were annexed by Israeli Occupation in 1967.