Sewage Networks Cost Indices and Percent Changes by Major and Sub Groups in the West Bank: November and December 2017

(Base Month January 2010=100)

 

Click Here To Download Excel File

Major and Sup Groups

November 2017 

December 2017 

% Change

Excavations

125.95

126.08

0.11

Deface Materials

101.55

101.29

-0.25

Asphalt, bitumen mixture and its products

85.09

85.18

0.11

Plastic and cements pipes

102.81

101.97

-0.82

Fountains

107.30

107.30

0.00

Administrative expenses

116.38

116.98

0.52

Wages and other costs

135.95

138.90

2.18

General  index

109.02

109.05

0.03


*The data of the West Bank doesn't cover those parts of Jerusalem which were annexed by Israel in 1967.