Construction Cost Indices and percent changes for Residential, Non-Residential and Skeleton buildings by Major Groups in the West Bank* for the years 2018 and 2017
(Base Year 2013=100)
click Here To Download Excel File |
|||||||||
Major Groups |
Residential buildings |
Non-residential buildings |
Skeleton Buildings |
||||||
Avg. 2017 |
Avg. 2018 |
% Change |
Avg. 2017 |
Avg. 2018 |
% Change |
Avg. 2017 |
Avg. 2018 |
% Change |
|
Raw materials |
98.46 |
100.49 |
2.07 |
98.89 |
100.77 |
1.90 |
96.19 |
100.03 |
4.00 |
Hiring of equipment |
101.20 |
101.54 |
0.34 |
101.73 |
102.06 |
0.33 |
102.21 |
102.51 |
0.29 |
Labour cost and wages |
117.29 |
118.40 |
0.94 |
117.29 |
118.40 |
0.94 |
120.74 |
121.43 |
0.58 |
All- Items Construction Cost Index |
104.15 |
105.84 |
1.63 |
104.16 |
105.78 |
1.55 |
102.61 |
105.53 |
2.84 |
*Data excluded those parts of Jerusalem which were annexed by Israeli Occupation in 1967. |