Water Networks Cost Indices by Major and Sub Groups in the West Bank* for the Years 2018 and 2017 

(Base Month January 2010=100)

click Here To Download Excel File

Major and Sub Groups 

West Bank

Average 2017

Average 2018

% Change

Water Reservoirs

105.24

109.78

4.31

Excavations

124.53

125.50

0.78

Concrete

104.83

104.39

-0.42

Iron

95.92

109.59

14.25

Construction work and paint

119.35

121.19

1.54

Miscellaneous

107.11

107.40

0.28

Administrative expenses

115.72

118.57

2.46

Water Networks

114.96

115.78

0.71

Excavations

124.53

125.50

0.78

Deface Materials

101.66

102.68

1.01

Asphalt, bitumen mixture and  its products

85.04

87.05

2.37

Plastic and steel Pipes 

122.02

121.13

-0.73

Administrative expenses

115.72

118.57

2.46

Wages and other costs

127.73

132.22

3.51

General  index

111.92

113.90

1.77


*Data excluded those parts of Jerusalem which were annexed by Israeli Occupation in 1967.