Water Networks Cost Indices by Major and Sub Groups in the West Bank for the Years 2017 and 2016
(Base Month January 2010=100)
Click Here To Download Excel File |
|||
Major and Sub Groups |
West Bank |
||
Average 2016 |
Average 2017 |
% Change |
|
Water Reservoirs |
102.33 |
105.24 |
2.85 |
Excavations |
118.88 |
124.53 |
4.75 |
Concrete |
106.34 |
104.83 |
-1.42 |
Iron |
87.71 |
95.92 |
9.36 |
Construction work and paint |
115.62 |
119.35 |
3.23 |
Miscellaneous |
107.24 |
107.11 |
-0.12 |
Administrative expenses |
110.49 |
115.72 |
4.74 |
Water Networks |
114.06 |
114.96 |
0.79 |
Excavations |
118.88 |
124.53 |
4.75 |
Deface Materials |
103.75 |
101.66 |
-2.02 |
Asphalt, bitumen mixture and its products |
90.41 |
85.04 |
-5.95 |
Plastic and steel Pipes |
120.37 |
122.02 |
1.36 |
Administrative expenses |
110.49 |
115.72 |
4.74 |
Wages and other costs |
125.05 |
127.73 |
2.15 |
General index |
110.40 |
111.92 |
1.38 |
The data of the West Bank doesn't cover those parts of Jerusalem which were annexed after 1967 occupation by Israel. |