Water Networks Cost Indices by Major and Sub Groups in the West Bank for the Years 2017 and 2016 

(Base Month January 2010=100)

 

<![if supportMisalignedColumns]> <![endif]>

Click Here To Download Excel File

Major and Sub Groups 

West Bank

Average 2016

Average 2017

% Change

Water Reservoirs

102.33

105.24

2.85

Excavations

118.88

124.53

4.75

Concrete

106.34

104.83

-1.42

Iron

87.71

95.92

9.36

Construction work and paint

115.62

119.35

3.23

Miscellaneous

107.24

107.11

-0.12

Administrative expenses

110.49

115.72

4.74

Water Networks

114.06

114.96

0.79

Excavations

118.88

124.53

4.75

Deface Materials

103.75

101.66

-2.02

Asphalt, bitumen mixture and  its products

90.41

85.04

-5.95

Plastic and steel Pipes 

120.37

122.02

1.36

Administrative expenses

110.49

115.72

4.74

Wages and other costs

125.05

127.73

2.15

General  index

110.40

111.92

1.38


The data of the West Bank doesn't cover those parts of Jerusalem which were annexed after 1967 occupation by Israel.