Sewage Networks Cost Indices by Major and Sub Groups in the West Bank* for the Years 2018 and 2017

(Base Month January 2010=100)

 

click Here To Download Excel File

Major and Sub Groups 

Avg. 2017

Avg. 2018

% Change

Excavations

124.53

125.50

0.78

Deface Materials

101.66

102.68

1.01

Asphalt, bitumen mixture and its products

85.04

87.05

2.37

Plastic and Cements Pipes

102.70

101.65

-1.02

Fountains

106.93

107.63

0.66

Administrative expenses

115.72

118.57

2.46

Wages and other costs

135.07

139.82

3.51

General  index

108.62

109.51

0.82


*Data excluded those parts of Jerusalem which were annexed by Israeli Occupation in 1967.